{"id":1730,"date":"2017-10-15T16:46:21","date_gmt":"2017-10-15T14:46:21","guid":{"rendered":"https:\/\/reeltech.sk\/revizie-elektrickych-zariadeni-a-bleskozvodov\/"},"modified":"2017-10-15T16:46:21","modified_gmt":"2017-10-15T14:46:21","slug":"revisions-elektrickych-devices-and-bleskozvodov","status":"publish","type":"page","link":"https:\/\/reeltech.sk\/en\/revisions-elektrickych-devices-and-bleskozvodov\/","title":{"rendered":"Revision of electrical equipment and lightning conductors"},"content":{"rendered":"<h1><img decoding=\"async\" class=\"alignleft size-full wp-image-1634\" src=\"https:\/\/reeltech.sk\/wp-content\/uploads\/2017\/10\/images_revizie-elektrickych-zariadeni.jpg\" alt=\"Revision of electrical equipment\" width=\"292\" height=\"140\" style=\"float: left; margin: 10px;\" srcset=\"https:\/\/reeltech.sk\/wp-content\/uploads\/2017\/10\/images_revizie-elektrickych-zariadeni.jpg 363w, https:\/\/reeltech.sk\/wp-content\/uploads\/2017\/10\/images_revizie-elektrickych-zariadeni-300x144.jpg 300w\" sizes=\"(max-width: 292px) 100vw, 292px\" \/><span style=\"text-decoration: underline;\"><strong><span style=\"font-family: arial, helvetica, sans-serif; font-size: 18pt;\">Performed by <span style=\"color: #000000; line-height: 16px; text-decoration: underline;\">professional inspections and examinations of electrical equipment<\/span> \/ <span style=\"line-height: 1.3em;\">revision of electrical installations and lightning conductors throughout Slovakia<\/span><span style=\"line-height: 1.3em;\">.<\/span><\/span><\/strong><\/span><\/h1>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Correct assessment of the condition of the inspected equipment is extremely important for the issuance of the Professional Inspection and Professional Examination (OP and OS) report, in which we use state-of-the-art measuring instruments for the correct detection of deficiencies in the inspected equipment.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">On the basis of record keeping, we are able to notify the customer in time of the need to carry out periodic professional inspection and professional testing of electrical wiring and lightning protection.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The inspection is followed by a proposal for improvements to improve safety. Our experience in the electrical industry ranges from inspections of domestic wiring, to power distribution systems used in industrial plants, to renewable energy installations (e.g. <a href=\"\/en\/service-of-photovoltaic-power-plants-2\/\" title=\"Service of photovoltaic power plants\">photovoltaic power plants<\/a>).<\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 6.75pt 0cm 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt;\"><strong><span style=\"font-family: arial, helvetica, sans-serif; color: #222233;\">Our activities include:<\/span><\/strong><\/span><\/p>\n<ul style=\"margin-top: 0cm;\" type=\"disc\">\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Professional inspections and professional tests \/ revisions of electrical equipment<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Revision of electrical wiring in houses, apartments, buildings, industrial objects<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"> Revision of lightning conductors and revision of electrical machines<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"> Revision of electrical appliances<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Revision of electric hand tools<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Review of photovoltaic power plants<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Revision of the biogas plant<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Revision of CHP units and power plants<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Revision of CHP units <\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Correction of identified post-audit deficiencies<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Control measurement of lighting intensity in Lux<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Thermal measurement \/ thermal imaging<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Thermal imaging of electrical installations (\"Thermovision electro\") <\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Thermal imaging measurement of buildings, houses and apartment buildings (\"Thermal imaging of buildings\")<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"> Electrical installation of LV and HV electrical substations<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Electrical installations of production halls<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Electrical installation of office premises<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Electrical installation of accumulator stations<\/span><\/li>\n<li>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Electrical installation of working machines<\/span><\/div>\n<\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Electrical installation of hand tools<\/span><\/li>\n<li>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Electrical installation of electrical appliances<\/span><\/div>\n<\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Maintenance of the electrical installation<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"> Operation and maintenance<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"> Modifications to wiring to save electricity&nbsp;<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"> Replacement and reconstruction of lighting, LED lighting<\/span><\/li>\n<li class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: 18pt; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Installation and revision, lightning protection<\/span><\/li>\n<\/ul>\n<div><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>In objects with hazards <span style=\"font-size: 10pt;\">blast<\/span> (Class B) without voltage limitation:<\/strong><\/span><\/div>\n<ul>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Gas regulating stations<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Lacquerware<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Spray boxes<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Pumping stations<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Gas boiler rooms<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Pumping stations<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Lightning arrestor for flammable substances storage and explosion hazardous area<\/span><\/li>\n<\/ul>\n<div><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>In high-voltage objects:<\/strong><\/span><\/div>\n<ul>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Transformer stations and other types of substation<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">High voltage wiring<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">High voltage connections<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif;\">Sectional switches<\/span><\/li>\n<\/ul>\n<p><b><span style=\"font-size: 9.0pt; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-fareast-language: SK;\">Translation of measurement results and complete inspection reports into foreign languages - English, German, Russian<\/span><\/b><\/p>\n<h5><strong>We operate in all regions<\/strong> Slovak Republic, while in the cities of Zvolen, Detva and Bansk\u00e1 Bystrica <strong>transport costs are not included<\/strong>. For foreign clients we provide translation into the language of your choice.<\/h5>\n<p><a href=\"https:\/\/plus.google.com\/+ReeltechSk\" rel=\"publisher noopener\" target=\"_blank\">ReelTech on Google+<\/a><\/p>\n<table style=\"width: 815px; height: 7084px;\">\n<tbody>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><span style=\"text-decoration: underline;\"><strong>Description of activities in the performance of revisions and specialised measurements<\/strong><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Revision of electrical equipment and electrical installation in a family house, built-up area of about 150m2<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit 6 - 10 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Switchgear status check over 20 devices<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of the circuit connected from the switchboard, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of the circuit connected from the switchboard, number of outlets in the circuit over 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Protection by a voltage or current protector<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Fault loop impedance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Transition resistance of supplementary and protective coupling<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Earth grounding resistance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Revision of electrical equipment and electrical installation of common areas of the apartment building<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit 6 - 10 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Switchgear status check over 20 devices<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of the circuit connected from the switchboard, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of the circuit connected from the switchboard, number of outlets in the circuit over 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Protection by a voltage or current protector<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Fault loop impedance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Transition resistance of supplementary and protective coupling<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Earth grounding resistance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Sample calculation: LV electrical connection<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the condition of the fuse box<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the condition of the electricity meter switchboard<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of the circuit connected from the switchboard, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Fault loop impedance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Transition resistance of supplementary and protective coupling<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Earth grounding resistance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Sample calculation: outdoor lighting, 10 poles<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the condition of the mast substation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Switchgear status check for up to 10 devices<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of the circuit connected from the switchboard, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Fault loop impedance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Transition resistance of supplementary and protective coupling<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Condition check of outdoor lighting, mast up to 5m, 1 circuit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Condition check of outdoor lighting, mast up to 5m, 2 circuits<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Condition check of outdoor lighting, mast above 5m height, 1 circuit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Condition check of outdoor lighting, mast above 5m height, 2 circuits<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Earth grounding resistance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Sample costing: power hand tools<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of power hand tools up to 500W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electric hand tools up to 1000W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of power hand tools over 1000W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electric hand tools without power differentiation, average price<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Revision: electrical appliance, 30 pieces<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electrical appliances up to 500W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electrical appliances from 500W to 1000W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electrical appliances over 1000W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of an electrical appliance without power differentiation, average price<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of computer setup: computer + monitor + keyboard + mouse<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Laptop revision with charging power supply<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of the movable extension lead<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of portable site lighting and spotlight<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of site switchboard, substation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Revision: lightning arrestor<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Lightning rod<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of the lightning conductor condition, price for one lightning conductor<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Active lightning arrestor condition check, price per one arrestor<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of measuring screws and clamps<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the conductivity and conductive connection of the roof sheathing, price per 1m<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of supports and lead wires, price per 1m<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the attachment of the protective angle<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of catching bars<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking brackets and canopy<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Earth grounding resistance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Electrical equipment and electrical installation, inspection and condition check:<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit from 6 to 10 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of electrical installation, number of outlets in the circuit over 10 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Switchboards, inspection and condition check<\/strong>:<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Switchgear status check for up to 10 devices<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Switchgear status check from 10 to 20 devices<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of insulation resistance of floors and walls<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the condition of the fuse box<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the condition of the electricity meter switchboard<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Check the condition of the switchgear with increased protection<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Condition check of switchgear in LV substation, price for one field<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the condition of the mast substation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Measurement during inspection of electrical equipment:<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of internal wiring of switchboard, fuse box, substation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of the circuit connected from the switchboard, number of outlets in the circuit up to 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of the circuit connected from the switchboard, number of outlets in the circuit over 5 pcs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Step or touch voltage measurement<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Protection by a voltage or current protector<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Fault loop impedance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Transition resistance of supplementary and protective coupling<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation resistance of antistatic flooring, price per 1m2<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Earth grounding resistance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Checking the connection of appliances in the electrical installation:<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the connection of the luminaire<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the connection of the thermal appliance<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Electric motor connection check up to 5kW<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the connection of an electric motor above 5kW<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Condition check of outdoor lighting, mast up to 5m, 1 circuit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Revision of public lighting:<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Condition check of outdoor lighting, mast above 5m height, 1 circuit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Condition check of outdoor lighting, mast above 5m height, 2 circuits<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Control of the condition of illuminated advertising<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the battery room and backup power source:<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Determining the status of the battery room<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Battery health check, up to 5 batteries, price for 1 piece<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Battery health check, over 5 batteries, price for 1 piece<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Check the condition of the pole pins<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of brackets, clamps, supports<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the status of the UPS backup power supply<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking the status of the charging power supply<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Auxiliary work during revision:<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Switching off the electrical equipment, testing and securing the off state<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Marking of switched-off electrical equipment with warning signs<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Switching the electrical equipment back on and testing<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Disassembly of the switchboard cover<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Reassembly of the switchboard cover<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Dismantling the instrument cover, box, luminaire<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Reassembly of the instrument cover, box, luminaire<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Disassembly of grounding test clamp<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Re-assembly of grounding test clamp<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>&nbsp;Electric hand tools<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Hand tools:<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of power hand tools up to 500W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electric hand tools up to 1000W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of power hand tools over 1000W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electric hand tools without power differentiation, average price<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Electrical appliance:<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>&nbsp;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electrical appliances up to 500W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electrical appliances from 500W to 1000W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of electrical appliances over 1000W<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of an electrical appliance without power differentiation, average price<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of computer setup: computer + monitor + keyboard + mouse<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Laptop revision with charging power supply<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of the movable extension lead<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of portable site lighting and spotlight<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Revision of site switchboard, substation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Revision of machine, working equipment, robotic equipment:<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection of the electrical installation of the working machine<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Control of machine documentation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking machine safety switches<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking safety markings<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Functional test and check of STOP buttons location<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Impedance measurement<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Continuity measurement by 10A method<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Insulation Resistance Measurement<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Creation of the Working Machine Manual&nbsp;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>High Voltage Review:<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Inspection and revision of transformer and transformer substation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Measurement of the earthing system and earthing of the substation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Review and development of local operating rules\/regulations ( MPP )<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Checking safety markings<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Measurement of high voltage electrical connection<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p>Measurement of lightning protection - high voltage lightning conductor, measurement of earthing<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 568px; text-align: center;\">\n<p><strong>Inspection in explosion hazardous areas<\/strong><\/p>\n<p>Revision of the paint shop and paint line<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: center;\">&nbsp;<span style=\"font-size: 14pt;\"><strong>Description of our activities<\/strong><\/span><\/p>\n<table style=\"width: 1085px;\">\n<tbody>\n<tr>\n<td style=\"width: 199px; text-align: center;\"><span style=\"font-size: 12pt; color: #808080;\">Installation<\/span><\/td>\n<td style=\"width: 242px; text-align: center;\"><span style=\"font-size: 12pt; color: #808080;\">Lightning rods<\/span><\/td>\n<td style=\"width: 187px; text-align: center;\"><span style=\"font-size: 12pt; color: #808080;\">Machines<\/span><\/td>\n<td style=\"width: 221px; text-align: center;\"><span style=\"font-size: 12pt; color: #808080;\">Appliances<\/span><\/td>\n<td style=\"width: 236px; text-align: center;\"><span style=\"font-size: 12pt; color: #808080;\">Other activities<\/span><\/td>\n<\/tr>\n<tr>\n<td>revision of electrical installation<\/td>\n<td>revision of electrical equipment and bleskozvodov<\/td>\n<td>revision technician machinery and mechanical equipment<\/td>\n<td>revision of electrical appliances<\/td>\n<td>high voltage revision technician<\/td>\n<\/tr>\n<tr>\n<td>revision of the electrical connection<\/td>\n<td>lightning rod inspection report<\/td>\n<td>revisions of working machines<\/td>\n<td>revision of appliances price<\/td>\n<td>Revision of the substation<\/td>\n<\/tr>\n<tr>\n<td>revision technician electrician bratislava<\/td>\n<td>lightning conductor inspection report<\/td>\n<td>time limits for revisions of working machines<\/td>\n<td>revision of electrical appliances and hand tools<\/td>\n<td>High Voltage Revision<\/td>\n<\/tr>\n<tr>\n<td>revision report of electrical wiring<\/td>\n<td>revision of active lightning conductor<\/td>\n<td>revision of electrical machines<\/td>\n<td>hand tool inspection report<\/td>\n<td>Revision of explosive environment<\/td>\n<\/tr>\n<tr>\n<td>revision technician electrician<\/td>\n<td>lightning conductor revision deadlines<\/td>\n<td>revision of electrical machines<\/td>\n<td>inspection card for power hand tools<\/td>\n<td>Revision of antistatic floors&nbsp;<\/td>\n<\/tr>\n<tr>\n<td>revision technician of electrical equipment<\/td>\n<td>lightning rod inspection report<\/td>\n<td>working machine revision price<\/td>\n<td>the inspection report for the electrical appliance<\/td>\n<td>high voltage revision<\/td>\n<\/tr>\n<tr>\n<td>electrical inspection technician<\/td>\n<td>lightning conductor revision<\/td>\n<td>working machine revision pattern<\/td>\n<td>hand tool inspection report<\/td>\n<td>local operating rule making<\/td>\n<\/tr>\n<tr>\n<td>electrical revisions<\/td>\n<td>lightning conductor revision deadlines<\/td>\n<td>revision of machines<\/td>\n<td>inspection card for power hand tools<\/td>\n<td>Implementation of the Local Operating Procedure ( LOP )<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">revision of electrical equipment decree<\/td>\n<td>working machine manual<\/td>\n<td>registration card for power hand tools<\/td>\n<td>Creation of MPP<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">professional inspections and examinations of electrical equipment<\/td>\n<td>operating instructions for the working machine<\/td>\n<td>hand tool inspection report<\/td>\n<td>Elaboration of the Local Operating Rules of the substation, high voltage<\/td>\n<\/tr>\n<tr>\n<td>electricity revision price<\/td>\n<td>lightning rod inspection report<\/td>\n<td>safety of machinery and equipment<\/td>\n<td>inspection card for power hand tools<\/td>\n<td>operating rules for electrical equipment<\/td>\n<\/tr>\n<tr>\n<td>initial review report<\/td>\n<td>lightning rod inspection report<\/td>\n<td>&nbsp;<\/td>\n<td>revision of electrical appliances and hand tools<\/td>\n<td>Review of photovoltaic power plants<\/td>\n<\/tr>\n<tr>\n<td>periodic review report<\/td>\n<td>lightning conductor inspection technician<\/td>\n<td>&nbsp;<\/td>\n<td>revision of electrical appliances<\/td>\n<td>Review of biogas plants<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">inspection report of electrical equipment<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>Revision of industrial objects<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">professional inspections and examinations of electrical equipment<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>Revision of production halls<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">rev\u00edzna sprava elektroinstalacie<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>main circuit breaker optimization<\/td>\n<\/tr>\n<tr>\n<td>electrical inspection repair<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>MRK optimisation<\/td>\n<\/tr>\n<tr>\n<td>revision of electricity in the apartment<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>main fuse replacement price<\/td>\n<\/tr>\n<tr>\n<td>revision of wiring in the apartment<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>main circuit breaker in front of the meter<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">inspection report of electrical equipment<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>thermal imaging<\/td>\n<\/tr>\n<tr>\n<td>revision of wiring<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>thermal imaging of the house<\/td>\n<\/tr>\n<tr>\n<td>revision report of electrical wiring<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>thermal imaging of electrical equipment<\/td>\n<\/tr>\n<tr>\n<td>wiring revision price<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>thermal imaging electro<\/td>\n<\/tr>\n<tr>\n<td>revision of electricity in the house<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>thermal imaging of the electrical installation<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">price list of professional inspections of electrical equipment<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>thermal imaging measurement<\/td>\n<\/tr>\n<tr>\n<td>revision technician electrician<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>thermal imaging of houses<\/td>\n<\/tr>\n<tr>\n<td>appliance inspection technician<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>revision of electrical installation medical premises<\/td>\n<\/tr>\n<tr>\n<td>electrical inspection Bratislava<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">revision technician of electrical equipment Bratislava<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">revision technician electrician Bratislava<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"We carry out professional inspections and professional tests of electrical equipment \/ revisions of electrical installation and lightning rods throughout Slovakia. The correct assessment of the condition of the inspected equipment is extremely important for issuing a report on the Professional Inspection and Professional Examination (OP and OS), during which we use the most modern measuring devices for the correct detection of deficiencies in the inspected equipment. Based on record keeping\u2026","protected":false},"author":11,"featured_media":1634,"parent":0,"menu_order":5,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1730","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/reeltech.sk\/en\/wp-json\/wp\/v2\/pages\/1730","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reeltech.sk\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/reeltech.sk\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/reeltech.sk\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/reeltech.sk\/en\/wp-json\/wp\/v2\/comments?post=1730"}],"version-history":[{"count":0,"href":"https:\/\/reeltech.sk\/en\/wp-json\/wp\/v2\/pages\/1730\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/reeltech.sk\/en\/wp-json\/wp\/v2\/media\/1634"}],"wp:attachment":[{"href":"https:\/\/reeltech.sk\/en\/wp-json\/wp\/v2\/media?parent=1730"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}